0 deflation test, Deflation test – ZOLL X Series Monitor Defibrillator Rev D User Manual
Page 47
Advertising
Maintenance Tests
9650-001356-01 Rev. D
ZOLL X Series Service Manual
41
22.0 Deflation Test
Equipment
Dual lumen NIBP hose, stop watch, NIBP simulator
Do This...
Observe This...
Pass/Fail
22.1 From the X Series NIBP Test control
panel, use the navigation keys to select:
•
Close Valve
•
Turn Pump On
22.2 Monitor the pressure reported by the
NIBP Test control panel or the external
pressure standard, and select Turn Pump
Off as soon as the pressure reaches the
target pressure of 265 +/- 5 mmHg.
22.3 Allow the system to stabilize for 5
seconds.
22.4 Use the navigation keys to select Open
Valve and immediately start the timer.
22.5 Stop the timer as soon as pressure drops
below 15 mmHg.
The pressure should drop within 10
seconds.
o
o
Advertising