Connection of bus between splitter and cu – 2N Lift8 v1.0 User Manual

Page 26

Advertising
background image

26

2N TELEKOMUNIKACE a.s., www.2n.cz

®

After plugging the

CJ into the socket the LED (Power/battery) should start to flash

(charging). The

charges the rechargeable batteries until fully charged.

CU

After some

time the flashing green LED (charging) should change to a permanently illuminated
green LED (battery charged).

Connection of bus between splitter and CU

We connect the central unit and splitter using the 6-wire main bus (power + - , audio +
- , data + - ). You must maintain the polarity.

Warning

Adhere to the polarity of the rechargeable batteries! When the polarity of
the rechargeable batteries is reversed, there is a danger of their fire or
explosion or damage to the electronics of the central unit.

Advertising