3 device operation, Initial power up, Device operation – Eaton Electrical PROFIBUS-DP EZ204-DP User Manual

Page 29: 3device operation

Advertising
background image

For more information visit: www.EatonElectrical.com

25

MN05013001E

3

Device Operation

Initial power up

X

Before you switch on the device, verify that it is properly

connected to the power supply, to the bus connector and to

the basic unit.

X

Switch on the power supply to the basic unit and the

PROFIBUS-DP expansion unit.

The Power LED of the EZ204-DP is lit. The BUS LED is off (no

communication via PROFIBUS-DP).
The GW message (intelligent station connected) is displayed

on the basic unit.

As soon as the device is integrated in the PROFIBUS-DP

network, the BUS LED is continuously lit (“static”) and the GW

message is statically displayed, also on devices with a

flashing GW message.

If the PROFIBUS-DP unit is factory set, the station address of

the PROFIBUS-DP station must be set.

Basic unit

GW display

EZ700

Flashing

EZ800

Flashing

EZD-CP8..

Flashing

J

Valid data is only transferred via PROFIBUS-DP to the

basic unit if the GW is displayed statically.

Advertising