Calibration frequency, Level 1 calibrations versus level 2 checks, Teledyne analytical instruments 229 – Teledyne GFC-7001T - Trace CO Analyzer User Manual

Page 229

Advertising
background image

EPA Calibration Protocol Teledyne API – Model T300/T300M CO Analyzer

Teledyne

Analytical

Instruments

229

Cylinders of working gas traceable to NIST-SRMs (called EPA Protocol Calibration
Gas) are also commercially available (from sources such as Scott Specialty Gases, etc.).
See Table 3-12 for a list of appropriate SRMs.

10.1.4. CALIBRATION FREQUENCY

To ensure accurate measurements of the CO concentrations, calibrate the analyzer at the
time of installation, and recalibrate it:
 No later than three months after the most recent calibration or performance audit

which indicate the analyzer’s calibration to be acceptable.

 When there is an interruption of more than a few days in analyzer operation.
 When any repairs have taken place which might affect its calibration.
 After a physical relocation of the analyzer.
 When any other indication (including excessive zero or span drift) of possible

significant inaccuracy of the analyzer exists.

Following any of the activities listed above, the zero and span should be checked to
determine if a calibration is necessary.

Table 10-2: Activity Matrix for Quality Assurance Checks

Characteristic

Acceptance limits

Frequency and method of

measurement

Action if requirements are not met

Shelter temperature

Mean temperature between
22

o

C and 28

o

C (72

o

and 82

o

F),

daily fluctuations not greater
than ±2

o

C

Check thermograph chart
weekly for variations greater
than ±2

o

C (4

o

F)

Mark strip chart for the affected time
period
Repair or adjust temperature control

Sample introduction
system

No moisture, foreign material,
leaks, obstructions; sample line
connected to manifold

Weekly visual inspection

Clean, repair, or replace as needed

Recorder

Adequate ink & paper
Legible ink traces
Correct chart speed and range
Correct time

Weekly visual inspection

Replenish ink and paper supply
Adjust time to agree with clock; note on
chart

Analyzer operational
settings

TEST measurements at
nominal values
2. GFC7001T in Sample Mode

Weekly visual inspection

Adjust or repair as needed

Analyzer operational
check

Zero and span within tolerance
limits as described in
Subsection 9.1.3 of Sec. 2.0.9
(Q.A. Handbook Vol II

4

)

Level 1 zero/span every 2
weeks; Level 2 between Level
1 checks at frequency desired
analyzer by user

Find source of error and repair
After corrective action, re-calibrate
analyzer

Precision check

Assess precision as described
in Sec. 2.0.8 and Subsection
3.4.3 (Ibid.)

Every 2 weeks, Subsection
3.4.3 (Ibid.)

Calc, report precision, Sec. 2.0.8 (Ibid.)

.

10.1.5. LEVEL 1 CALIBRATIONS VERSUS LEVEL 2 CHECKS

Essential to quality assurance are scheduled checks for verifying the operational status
of the monitoring system. The operator should visit the site at least once each week. It
is recommended Level 1 zero and span check conducted on the analyzer every two

Advertising