Unpacking the eddy current brake, Unpacking the eddy current brake -7 – Dynojet 250iP: Pit Installation Guide User Manual

Page 27

Advertising
background image

I N S T A L L A T I O N

Eddy Current Brake

Version 2

Model 200iP/250iP Motorcycle Pit Dynamometer Installation Guide

2-7

U

NPACKING

THE

E

DDY

C

URRENT

B

RAKE

1

Remove the four bolts securing the brake to the crate.

2

Remove the retarder connector plates, if present.

3

Determine if the brake is to be mounted on the left or right side of your dyno.
Make the following adjustments to the eddy current brake only if you want to
mount the brake on the opposite side of the dyno that it is currently set up for.
• Move the coupler and key to the other side of the brake.

To remove the key, use a punch and a hammer to apply pressure in the

direction of the arrows shown in Figure 2-7.

• The retarder connector plates (removed in step 2) will need to be moved to

the other side of the brake once the brake is installed in the pit.

• Move the temperature sensor to the other side of the brake.

Figure 2-6: Left or Right Side Brake Set Up

connector plate

eddy current brake set up for left side installation

eddy current brake set up for right side installation

coupler

temperature

sensor

connector plate

coupler

temperature sensor

connector plate

connector plate