A C C E S S O R I E S

High Pressure Blower

Version 2

Model 200iP/250iP Motorcycle Pit Dynamometer Installation Guide

3-25

A

TTACHING

THE

B

LOWER

C

ABLES

The blower cables were routed from the CPI to the junction box on page 2-27. Refer
to “Routing the High Pressure Blower Cables” on page 2-27 for more information.
1

Attach the two blower connectors to the junction box using 4-40 screws.
Note: The blower connectors are attached to the blower cables.

2

Connect the cables from each blower to the connectors on the junction box.
Note: There is an extension cable (P/N 76950317) for the blower furthest from
the junction box.

3

Test the blowers by pressing the appropriate buttons on the control panel. If the
right-hand blower turns on when the left-hand blower button is pressed, shut off
the blowers and switch the cables at the junction box.

Figure 3-24: attach the Blower Cables

PD032A

extension cable

connectors

CPI

dyno

electronics

Advertising