Dynojet 250iP: Pit Installation Guide User Manual

Page 31

Advertising
background image

I N S T A L L A T I O N

Eddy Current Brake

Version 2

Model 200iP/250iP Motorcycle Pit Dynamometer Installation Guide

2-11

11 Replace the existing set screws on the coupler with the thread-lock set screws

provided.

12 Tighten the coupler set screws.

Figure 2-11: Tighten the Set Screws

S

ECURING

THE

D

RUM

AND

B

RAKE

M

ODULE

TO

THE

P

IT

F

LOOR

Dynojet recommends you secure your drum and brake modules to the pit floor in
your dyno room using concrete anchors. You will want to drill the holes and secure
the dyno before placing the covers on your dyno.

Note: You may wish to drill the holes for the carriage mounting plate, blower
mounts, and the support arm at this time. Refer to page 2-13 for carriage plate
instructions and page 2-16 for blower mounts and support arm instructions.

1

Drill the holes for Red Head Anchors.

2

Install the Red Head anchors according to the instructions in Appendix A.

Figure 2-12: Secure the Drum and Brake Module to Pit Floor

brake shaft

dyno shaft

set screw

drill holes

drill hole (not visible) only when brake is mounted on right side

drill holes

drill holes

Advertising
This manual is related to the following products: