Dynojet 250iP: Pit Installation Guide User Manual

Page 55

Advertising
background image

I N S T A L L A T I O N

Routing Cables

Version 2

Model 200iP/250iP Motorcycle Pit Dynamometer Installation Guide

2-35

R

OUTING

THE

A

IR

P

UMP

P

OWER

, A

IR

F

UEL

S

ENSOR

,

AND

D

YNO

E

LECTRONICS

P

OWER

C

ABLES

1

Route the air pump power cable (P/N 76950318) from the CPI to the air pump.

2

Route the air fuel sensor cable (P/N 76950701) from the dyno electronics to the
air pump.

3

Route the dyno electronics power cable to your power source. Refer to “Dyno
Electronics” on page 1-10 for the
dyno electronics power cable location.

Figure 2-37: Route the Air Pump Power, Air Fuel Sensor, and Dyno Electronics Power Cables

PD036A

air pump

CPI

dyno electronics

power cable

dyno

electronics

air pump

power cable

air fuel

sensor cable

Advertising
This manual is related to the following products: