Dynojet 250iP: Pit Installation Guide User Manual

Page 43

Advertising
background image

I N S T A L L A T I O N

Routing Cables

Version 2

Model 200iP/250iP Motorcycle Pit Dynamometer Installation Guide

2-23

R

OUTING

THE

C

ONTROL

P

ANEL

, P

ENDANT

C

ABLES

,

AND

RPM C

ABLE

1

Route the control panel cable (P/N 76951502) from the CPI through the
designated communications pit conduit, through the pit, and out of the pit as
shown.

2

Route the pendant cable from the dyno electronics input/output module through
the same conduit and along the same path as the control panel cable. Refer to
“Dyno Electronics” on page 1-10.
Note: Be sure to keep the power and communications cables in different pit
conduits.

3

Route the RPM induction connection cable from the dyno electronics RPM
module through the same conduit and along the same path as the control panel
cable.
Note: Routing the RPM cable is optional.

4

From the pit, route the cables through the junction box.

Figure 2-24: Route the Control Panel, Pendant Cables, and RPM Cables

PD028A

CPI

dyno

electronics

route communications cables

in designated conduit

route power cables

in designated conduit

Advertising
This manual is related to the following products: