Sequence for calling sbs – Pilz PSS SB FT, Basic license User Manual

Page 159

Advertising
background image

Modular Block System: Burner Management

6-115

Block

Connection required

Reason

SB159

ENBL (SB152)

Valve lock when a

SyOK (SB159)

shutdown occurs

RUN (SB159)

For main flame

RUN (SB150, SB152)

monitoring

FLAM (SB159) ®

For main flame

MONI (SB150) monitoring

Triggered pulse via neg. edge Fault leads to a controlled
form

ENBL (SB159)

shutdown (when

AuSt = 1

AND-connection before

with restart)

ERR (SB152)
or
Triggered pulse via neg. edge Fault leads to a safety
from

ENBL (SB159)

shutdown

AND-connection before

CHAI (SB152)

Sequence for calling SBs

NOTICE

To avoid errors, always keep to the following sequence when calling up
the SBs:

- SB157: as the first block to be called up in a sequence, i.e. before all

SB149 blocks

- SB158: call up SB158 before calling up one or more SB150 blocks

for flame monitoring

- SB159: call up SB159 before calling up one or more SB150 blocks

for flame monitoring

- SB152: call up SB152 after all other blocks have been called up

Advertising
This manual is related to the following products: