Pilz PSS SB FT, Basic license User Manual

Page 163

Advertising
background image

7-3

Modular Block System: Burner Management

Create OB101

- Reset all enable flags (

ENBL/FG) at the start of OB or at the start of

the cycle. This way you can be sure that the

FG/ENBL flags are

indeed set

INFORMATION
On some blocks (e.g. E-STOP) the input parameter “

SSNR” is monitored

(see relevant SB descriptions in chapter 6). These blocks must be run
through as part of each PSS-cycle. The following commands should
therefore be inserted once only at the end of OB101:

DB015

A

DW1015

I

- Call up the E-STOP standard function blocks directly in OB101 or, for

example, initialise a global call-up in an FB.

- Check:

Have all the blocks required for the application been called up?

Things to note when starting up the program

Tip:

The PSS clears all flag words, outputs, timers and counters in the FS
section on start-up. All the necessary constants should therefore be
set when starting up the program.

Link project

INFORMATION

- Check all safety devices to ensure that they function correctly.

- Short-circuits and wire breaks should be simulated.

Advertising
This manual is related to the following products: