Super Systems 20Q User Manual

Page 5

Advertising
background image

1

MOUNTING REQUIREMENTS

MOUNTING REQUIREMENTS

MOUNTING REQUIREMENTS

MOUNTING REQUIREMENTS

MOUNTING REQUIREMENTS

Select a location, for instrument mounting, where minimum
vibrations are present and the ambient temperature is within 0
and 50 °C (32 and

122 °F).

The instrument can be mounted on a panel up to 15 mm thick
with a cutout of 92 x 45 mm (PKC) or 92 x 92 (MKC).
For outline and cutout dimensions refer to Fig. 2.
The surface texture of the panel must be better than 6,3

µ

mm.

The instrument is shipped with rubber panel gasket (50 to 60
Sh).
To assure the IP65 and NEMA 4 protection, insert the panel
gasket between the instrument and the panel as shown in fig. 1.
While holding the instrument against the panel proceed as
follows:
1) insert the gasket in the instrument case;
2) insert the instrument in the panel cutout;
3) pushing the instrument against the panel;
4) insert the mounting brackets as shown in fig.1;
5) with a screwdriver, turn the screws with a torque between

0.3 and 0.4 Nm.

Fig. 1

Gasket

bracket

bracket

Panel

Screws

mkc-ssi.pmd

06/07/2004, 12.19

1

Advertising