Platforms – Grain Systems PNEG-707GSI User Manual

Page 132

Advertising
background image

10. Catwalks and Platforms

132

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Platforms

See flat layouts in

Orientation Section on Page 32

for placement of platforms.

See Figure 10C on Page 116

for platform.

Use 5/16" x 3/4" whiz lock bolts and nuts.

1. For each platform, install two (2) sections of catwalk flooring (with toeboards, diagonal supports,

vertical supports, and handrails.)

2. Bolt entry toeboard and end toeboard to catwalk flooring.

3. Bolt additional catwalk vertical support (at dryer) to horizontal catwalk support.

4. Bolt two (2) end handrails between catwalk vertical supports.

5. Bolt entry handrail extension to entry toeboard.

6. Bolt two (2) entry handrails to entry handrail extension and catwalk vertical support.

7. Bolt safety cage hoops to platform entry handrail extensions.

Check that all connections are made, and bolts are tight.

Additional Parts

One (1) entry toeboard

One (1) end toeboard

Two (2) end handrail

Two (2) entry handrail

One (1) handrail extension

Advertising