Gsi decal – Grain Systems PNEG-707GSI User Manual

Page 18

Advertising
background image

3. Safety Decals

18

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

GSI Decal

The standard location for the GSI decal is on the side of the dryer that can be seen from the operating
facility and/or from access road. GSI decal will be centered on top two (2) solid wall sheets, just below
roof section. Remove nuts and bolts from the seam of those two (2) solid wall sheets.

Remove backing from GSI decal. Center and apply GSI decal to top two (2) solid wall sheets. Smooth
out air bubbles. Remove masking from front of GSI decal. Drill out bolt holes and replace bolts.

Advertising