Grain Systems PNEG-707GSI User Manual

Page 252

Advertising
background image

24. Fuel Train

252

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Figure 24U Maxons (A) and modutrol mounting

bracket (B) installed. Support fuel train at all times.

Figure 24V Installing regulator section.

Figure 24W Checking fuel train is level, then

measuring for fuel train stands.

Figure 24X Adapt fuel train stands to meet

site requirements.

Figure 24Y Close Up - Bolting fuel train stand.

Figure 24Z Securing fuel train to fuel train stand

with 3" U-bolt.

A

A

B

Advertising