5. Plenum Roof
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
51
Figure 5H
Figure 5I
= Jig clips
install to foundation
at intervals of 4' 1-1/4" around circle A.
= Vertical channels are bolted to jig clips.
A = Center of foundation,
(marks center of dryer)
B = Circle drawn for jig chip installation
radius is 7' 11-3/16"
(marks inside wall of dryer)
C = Dryer perimeter
(marks outside wall of dryer)
D = Foundation perimeter
minimum required is 23' diameter
NOTE: Note orientation of vertical channels. Each vertical
channel mirrors the previous one.