Grain Systems PNEG-707GSI User Manual

Page 51

Advertising
background image

5. Plenum Roof

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

51

Figure 5H

Figure 5I

= Jig clips
install to foundation
at intervals of 4' 1-1/4" around circle A.

= Vertical channels are bolted to jig clips.

A = Center of foundation,
(marks center of dryer)

B = Circle drawn for jig chip installation
radius is 7' 11-3/16"
(marks inside wall of dryer)

C = Dryer perimeter
(marks outside wall of dryer)

D = Foundation perimeter
minimum required is 23' diameter

NOTE: Note orientation of vertical channels. Each vertical

channel mirrors the previous one.