Metering system (continued) – Grain Systems PNEG-707GSI User Manual

Page 235

Advertising
background image

22. Metering System

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

235

Metering System (Continued)

Align keyways on metering drum gearbox and metering drum drive shaft. Insert 5/8" x 5/8" x 5" key.

Bolt gearbox adjustment plate to gearbox torque arm assembly.

Use 1/2" x 1", grade 5 bolts and nuts.

Bolt motor to gearbox.

(See Figure 22Y on Page 237.)

Use 3/8" x 1", grade 5 bolts.

Figure 22Q Gearbox torque arm assembly installed to

inside hopper wall.

Figure 22R Sliding gearbox set collar (2-3/8") onto

metering drum drive shaft.

Figure 22S Applying anti-seize to metering

drum drive shaft.

Incorrect installation could stress gearbox and motor bearings, resulting
in failure.

Advertising