Grain Systems PNEG-707GSI User Manual
Page 199
![background image](/manuals/277631/199/background.png)
18. Windows and Doors
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
199
Heat Section Door (Continued)
4. Wrap 3" wide heat section door sleeve around inside of door frame. Tap hammer it around inside
of door frame to fit snuggly.
Open and shut heat section door to check fit of heat section door sleeve to seal door.
Adjust as required.
Secure heat section door sleeve with self tapping # 10 x 1" screws.
5. Apply silicone injection caulking to seal any gaps between heat section door sleeve and door frame.
6. Press bulb seal along inside edge of heat section door sleeve.
7. Bolt door handle to pre-drilled bolt holes on outside of heat section door.
Use 5/16" x 3/4" whiz lock bolts and nuts.
8. Install door latch and hooking bracket to outside of heat section door as follows.
Use #10 x 1" self-tapping screws.
Figure 18AO Installing 3" wide heat section
door sleeve.
Figure 18AP Wrapping heat section door sleeve
around inside of door frame.