Pre-assembly of window kits (continued) – Grain Systems PNEG-707GSI User Manual

Page 190

Advertising
background image

18. Windows and Doors

190

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Pre-assembly of Window Kits (Continued)

Figure 18M Close Up - Mark window frame bolt holes.

Figure 18N Line marked (by arrow) is inside perimeter

of window frame. Cut on outside of line because wall

sheets will lie inside window frames.

NOTE: Can save wall sheet cut out to use as a

pattern on next dryer installed.

Figure 18O After cutting window outline, realign

window frame to wall sheets and drill out bolt holes.

Figure 18P Close Up - Aligning wall sheets to window

frame so bolt holes can be drilled. Note wall sheets are

installed on top of window frame flange.

Figure 18Q Match marks on each sheet. Draw arrow to

indicate “up” direction for installation.

Figure 18R Bolt window frame to wall sheets.

Drill bolt holes for air deflector at bottom of window
frame, drilling 1" x 1" from corners
.

Advertising