Grain Systems PNEG-707GSI User Manual

Page 227

Advertising
background image

21. Hopper

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

227

Hopper (Cross Section) Example - All Models (Continued)

Figure 21W Aligning hopper discharge weldment to

outside hopper panels.

Figure 21X Drilling two (2) outside bolt holes at each

end of metering drum bearing support. NOTE: Center

bolt hole (arrow) is bolted with common bolt to a flat

edged outside hopper panel seam. Check for level.

Figure 21Y Installing metering drum floor clips (arrow)

around bottom perimeter of outside hopper.

Figure 21Z Installing metering drum floor to underside

of metering drum floor clips. Check for level.

Figure 21AA Close Up - Installing metering drum

floor to metering drum floor clips.

Figure 21AB Caulking metering drum floor

with silicone caulk.

Metering drum floor to
be installed to clips.

.

Metering drum

Advertising