Grain Systems PNEG-707GSI User Manual

Page 58

Advertising
background image

5. Plenum Roof

58

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Snug bolt tops of plenum roof rafters to plenum roof center collar. Use 3/8" x 1" hex head galvanized
bolts and nuts.

Snug bolt bottoms of plenum roof rafters in pairs of bolt holes along top of eave channel. Use
3/8" x 1-1/4" grade 8 hex head bolts and nuts. (3/8" Galvanized washers as needed.)

2. Snug bolt two (2) more plenum roof rafters to plenum roof center collar. Orient to bolt holes in

plenum roof center collar as shown in

Figure 5Z

.

Figure 5Z

3. Install remaining sixteen (16) plenum roof rafters to plenum roof center collar as shown

in

Figure 5AA

.

Figure 5AA

4. Level plenum roof center collar.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

L.H.

R.H.

Advertising