6. Tower Roof

78

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Expansion Ring

After expansion ring clips are installed to tower roof sheets, install expansion ring sections as follows.

Use expansion ring hardware.

(See Figure 6AA on Page 79.)

Double nut (spin two (2) nuts closely

together) each expansion bolt.

NOTE: Expansion bolts should be fully contracted during installation. In other words, leave double nuts

spun closely together until after expansion ring is complete.

1. Insert first expansion ring section into expansion ring clips.

Double nut an expansion bolt and screw into first expansion safety ring section.

Insert next expansion ring section into adjoining expansion ring clips. Screw second expansion ring
section onto free end of first expansion bolt.

Continue installing expansion ring sections until ring is complete around tower roof.

2. Tighten all tower roof bolts, including bolts on eave clips and intermediate eave clips.

3. Tighten expansion bolts between expansion ring sections by spinning double nuts apart. Spin nuts

evenly around tower roof until expansion ring lifts tower roof to show a slight crown.

Figure 6Y Expansion Ring Sections

Figure 6Z Expansion Ring Hardware

A

B

C

A. Expansion ring clip (4")
B. 1" x 6" (Full thread) Expansion bolts
C. 1" Expansion nuts