23. Fuel Piping
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
241
Fuel Piping Guidelines (Continued)
Figure 23K Installed fuel pipe exits heat section through
pre-cut hole in center of fan housing splice (arrow).
Figure 23L Close Up - Installed fuel piping exits heat section through pre-cut hole in
center of fan housing splice. NOTE: 3" Pipe riser clamp.