Plenum roof flashing – Grain Systems PNEG-707GSI User Manual

Page 62

Advertising
background image

5. Plenum Roof

62

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Plenum Roof Flashing

Install plenum roof flashing (with tabs down) over inside top plenum wall sheets.

Overlap plenum roof flashing.

Snug bolt with 5/16" x 1" whiz bolts and nuts.

Do not tighten bolts in tabs on flashing until after plenum roof sheets are installed.

Figure 5AN Installing plenum roof flashing with tabs over inside top wall sheets.

Figure 5AO Tabs on plenum roof flashing are marked by “X”.

X

X

X

X

X

Advertising