Vertical channel comparison, Vertical channels – Grain Systems PNEG-707GSI User Manual
Page 43
4. Orientation Wall Sheets and Vertical Channels
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
43
Vertical Channel Comparison
Figure 4AA Vertical Channels
Figure 4AB Close Up - Vertical Channels
Vertical Channels
10 Gauge vertical channels (lighter) generally installed from roof down to blower level.
8 Gauge vertical channels (heavier) installed from blower level down.
Larger dryers change gauge higher up.
Vertical base channels installed at base of dryer.
A
B
C
D
E
A. Vertical channel - 80", 10 gauge
B. Vertical channel - 80", 8 gauge
C. Vertical channel, 40", 8 gauge
Use as required to fill in vertical
channel column.
D. R.H. Vertical base channel, 88-1/2", installed
at base of dryer.
E. L.H. Vertical base channel, 88-1/2", installed
at base of dryer.
GT4-0248V
GT4-0249V
Y
Z
X
X. Vertical channel - 80", 8 gauge (bolt holes in
side are evenly spaced.)
Y. Vertical channel - 80", 10 gauge (three (3)
bolt holes in center of side are spaced
closely together.)
Z. On the widest side of all 10 gauge vertical
channels there are two (2) sets of bolt
holes which are only used to install the
grain turners.