21. Hopper

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

225

Hopper (Cross Section) Example - All Models (Continued)

Figure 21K Metering drum is hoisted before hopper

is installed. NOTE: Access opening in cool

section floor (arrow).

Figure 21L In photo, to demonstrate orientation,

compression angle splice (arrow) is temporary bolted

to compression angles. In actual installation, use

common bolt to install outside hopper panels (over

compression angle splice) to compression angles.

Figure 21M View from above - Bolting outside

hopper panels over compression angles and

compression angle splices.

Figure 21N View from below - Bolting outside hopper

panels over compression angles and

compression angle splices.

Figure 21O Close Up - Aligning outside hopper

panels over compression angles and

compression angle splice (arrow).

Figure 21P Aligning Outside Hopper Panels