Compression angle weldments (continued) – Grain Systems PNEG-707GSI User Manual

Page 210

Advertising
background image

19. Tower Base

210

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer

Compression Angle Weldments (Continued)

Figure 19N Compression angle weldments encircle base of dryer.

Figure 19O Inside view - Installing compression angle weldments.

NOTE: Inside solid wall sheet will be installed after compression angle weldment, with one rolled plenum

channel in 4

th

bolt hole.

Advertising