Conveyor beams (continued) – FlexLink XS (45 мм) Монтаж User Manual
Page 20

20
Assembly
Conveyor beams (continued)
Mounting conveyor beam support brackets
X..CT, X..CU, X..CS
Start by erecting structural beams and attach one con-
veyor beam support bracket to each beam.
It may be easier not to mount the second bracket until
slide rail has been mounted and, if using catenary or end
drive unit, the chain has been installed.
Mounting
Box wrench
13 mm
Hex head screws
M6S 8×16
Slot nuts
XCAN 8
Washers
BRB 8,4×16
T-bolts
XLAT 17
Nuts
XLAN 8
Washers
BRB 8,4×16
1
Attach screws, nuts and washers to the support
bracket before mounting. (Screws and slot nuts are
support beam fasteners, T-bolts and nuts are con-
veyor beam fasteners.)
Slide the slot nuts of one support bracket into the sup-
port beam T-slots. Tighten the screws. Make sure that
the support bracket is aligned with the beam cross-
section as shown in the drawing.
2
Insert the slot nuts of the second support bracket into
the support beam T-slots. Slide the bracket down so
that it does not protrude above the cross-section of
the beam.
3
Use a soft hammer to mount an end cap on to the
support beam.
4
Mount the first support bracket to the conveyor beam.
Pull the second bracket up and insert the T-bolts into
the conveyor beam T-slot. Tighten the nuts.