Conveyor system xk – FlexLink XS (45 мм) Монтаж User Manual

Page 55

Advertising
background image

Assembly

55

Conveyor system XK

Installation of slide rail on conveyor beam
XKCB N

Mounting:

Cutting pliers

Hammer

Screwdriver

Clamp

Knife

Drill

Drill bit

∅4,2 mm

Drill fixture

3920500

Plastic screws

XWAG 5

1

Cut the slide rail in a 45° angle.

2

Mount slide rail on the lower flange of the conveyor
beam.

3

Drill holes for plastic XWAG 5 screws.

4

Use a screwdriver to insert the screws. Cut off the
screw heads using a knife and a hammer. File off pro-
truding edges.

5

On the upper flange of the slide rail, use the drill fix-
ture to drill two holes in the slide rail before it enters
the XKCB N beam.

Advertising