Conveyor system xk (continued) – FlexLink XS (45 мм) Монтаж User Manual

Page 56

Advertising
background image

56

Assembly

Conveyor system XK (continued)

I

6

Use a screwdriver to insert the screws. Cut off the
screw heads using a knife and a hammer. File off pro-
truding edges. The cut should be made away from the
joint, in the direction of travel.

7

Use a clamp to press the slide rail on to the beam
flange where the type N beam begins.

8

Drill one additional hole and insert a screw in the slide
rail at the beginning of the type N beam section.

9

Install the chain as shown in the picture.

Advertising