Disassemble 3s-3000f/sgs lh clutch, Pre-assemble 3s-3000f/sgs lh clutch, Prepare new 3s-3000f/sgs lh power shaft – Great Plains Electric Clutch Package User Manual
Page 48
44
Electric Clutch Package
Great Plains Manufacturing, Inc.
195-073M
03/24/2009
Disassemble 3S-3000F/SGS LH Clutch
14. Remove and save three sets:
802-152C HHCS 1/4-20X2 GR5
804-006C WASHER LOCK SPRING 1/4 PLT
The assembly is usually still held together by roll
pins.
15. Pry both sprockets off. Remove and save:
195-160H SPKT CLUTCH 40B23T RND BORE
808-240C
SPKT 40A23X1.813-1.818 BR/6HOL
The following normally remain inside sprocket
and do not need to be removed:
The remaining parts are not re-used.
Pre-Assemble 3S-3000F/SGS LH Clutch
16. Select one each new:
823-231C OGURA CLUTCH
195-347D ELECTRIC CLUTCH ADAPTOR
and three sets new:
802-684C HHCS M8X1.25X55 GR8.8
804-157C WASHER SPRING LOCK M8 PLT
Set the clutch assembly on a work surface, with the
torque arm end of the Ogura clutch down.
17. Secure the large end of the 195-347D adaptor
to
the Ogura clutch
with the bolts
and lock wash-
ers
. Torque to specifications (see page 93).
Prepare New 3S-3000F/SGS LH Power Shaft
18. Select one each new:
195-346D SHAFT 7/8 HEX 32.44 LG
805-180C PIN ROLL 1/4 X 1 1/2 LG PLT
19. Drive pin
into the inner hole of the shaft
Figure 70: 3S-3000F/SGS:
Disassemble LH Clutch
16465
Figure 71: 3S-3000F/SGS:
Pre-assemble LH Clutch
28144
U
D
Figure 72: 3S-3000F/SGS:
Pin New LH Shaft
28094
21