Chapter 2. installation and startup, 1 unpacking and inspection, Chapter 2. installation – Comtech EF Data turboIP-G2 User Manual

Page 37: Startup

Advertising
background image

2–1

Chapter 2. INSTALLATION

AND

STARTUP

2.1

Unpacking and Inspection

The turboIP-G2 and its Installation and Operation Manual were packaged and shipped in a
reusable cardboard carton containing protective foam spacing.

This equipment contains parts and assemblies sensitive to damage by
Electrostatic Discharge (ESD). Use ESD precautionary procedures when
handling the equipment.

Once opened, inspect the shipment:

Step

Task

1

Keep all shipping materials for storage or reshipment.

2

Check the packing list to ensure the shipment is complete.

3

Inspect the equipment for any possible damage incurred during shipment. Contact
the carrier and Comtech EF Data immediately to submit a damage report if damage
is evident.

4

Review the Installation and Operation Manual carefully to become
familiar with operation.

5

Proceed to Section 2.2 Rack Mounting the turboIP-G2.

Advertising