Comtech EF Data turboIP-G2 User Manual

Page 39

Advertising
background image

turboIP-G2 Performance Enhancement Proxy

Revision 2

Installation and Startup

CD-TURBOIP-G2

2–3

2.2.1 Rack Mounting – Full-Width turboIP-G2 Configuration

The tool required for this installation is a medium Phillips

screwdriver. Each Full-Width

turboIP-G2 is provided with two Universal Front Rack Brackets (with pre-assembled handles
attached).







Figure 2-2. Full-Width Configuration – Universal Front Rack Bracket Installation

Final assembly of a Full-Width turboIP-G2 is accomplished as follows:

Step

Single Unit Mounting Procedure

1

As shown in Figure 2-2: Secure one (1) Universal Front Rack Bracket (with pre-
assembled handle) to each side of the turboIP-G2 Full-Width chassis using three
(3) of the provided M3 x 6mm long flat head machine screws per side.

2

As shown in Figure 2-1: Install the turboIP-G2 Full-Width chassis assembly into
a 1RU rack space; use the front mounting ears to secure the configuration to the
rack’s front mounting rails as needed (mounting hardware provided by customer).

(2X) Universal Front Rack Bracket

(3X) #6-32 x 1/4” lg. screws per side

(with pre-assembled handle)

Advertising