HEIDENHAIN TNC 360 ISO Programming User Manual

Page 180

Advertising
background image

8-27

8

Cycles

TNC 360

Fig. 8.33:

ROUGH-OUT cycle

Fig. 8.34:

CONTOUR MILLING cycle

Fig. 8.32:

PILOT DRILLING cycle

8.3

SL Cycles

The following scheme illustrates the application of the cycles Pilot Drilling,
Rough-Out and Contour Milling in part programming:

1. List of contour subprograms

G37
Cycle call not required.

2. Drilling

Define and call drilling tool
G56
Pre-positioning
Cycle call required!

3. Rough-out

Define and call tool for rough milling
G57
Pre-positioning
Cycle call required!

4. Finishing

Define and call finish milling tool
G58/G59
Pre-positioning
Cycle call required!

5. Contour subprograms

M02 *
Subprograms for the subcontours.

Advertising
This manual is related to the following products: