Datum shift g54 -30, Datum shift g54 – HEIDENHAIN TNC 360 ISO Programming User Manual

Page 183

Advertising
background image

8-30

8

Cycles

TNC 360

Fig. 8.36:

Activation of the datum shift

Fig. 8.37: Datum shift, absolute

Fig. 8.38: Datum shift, incremental

8.4

Cycles for Coordinate Transformations

X

Y

Z

Y

X

Z

Y

X

Z

IX

IY

Y

X

Z

X

Y

DATUM SHIFT G54

Application

You can repeat machining operations at various locations on the work-
piece by shifting the datum.

Activation

When the DATUM SHIFT cycle has been defined, all coordinate data are
based on the new datum. Shifted axes are identified in the status display.

Input data

Only the coordinates of the new datum need to be entered. Absolute
values are based on the workpiece datum manually defined with datum
setting. Incremental values are based on the last valid datum; this datum
can itself be shifted.

Cancellation

To cancel a datum shift, enter the datum shift coordinates X = 0, Y = 0
and Z = 0.

When combining transformations, program the datum shift first.

Advertising
This manual is related to the following products: