9 connecting to a sonde – Xylem 6-Series Multiparameter User Manual

Page 145

Advertising
background image

650 MDS

Section 3

YSI Environmental Monitoring Systems Operations Manual

3-15

As shown above, enter the designation “YSI 650” using the general instructions outlined above. Start by

pressing the numeric 9 key three times in rapid succession while viewing the characters on the display until

a “Y” appears. After the entry is complete, pause and the cursor will automatically move to the next entry

position. Now press the numeric 7 four times in succession while viewing the characters on the display.

When an “S” appears, pause and the cursor will move automatically to the next entry position. Continue

with the entries in this way until ID designation is complete. If you make a mistake, you can use the left

arrow key to highlight the flawed entry and correct it. When the entry is complete, press Enter to confirm

it. Note that for this example, where both alpha and numeric entries are appropriate, the user must press the

numeric 2 key 4 times in succession to generate the number 2, as opposed to the previous clock-setting

example where a single press of the numeric 2 key generated the number 2.

After completing the above example, press the Escape key repeatedly to return to the 650 Main menu and

then proceed to the next section.

3.2.9 CONNECTING TO A SONDE

The primary use of the 650 is to interface with YSI 6-series sondes. In this configuration, you will be able

to see data from the sonde sensors in real-time on the 650 display as well as to configure the sonde for your

particular application. In addition, once sonde interface is established, you will be able to easily log data

from the sonde sensors to either the memory of the sonde or the memory of the 650 for later analysis.

The connection between the sonde and the 650 is made via the mating of MS-8 connectors on the standard

YSI field cable and the bottom of the 650 case. To make the connection, hold the 650 in one hand, place

the 650 and cable connectors together, and rotate the field cable connector until engagement occurs. Then

rotate the field cable connector approximately 1-quarter turn until it is fully engaged as evidenced by a

Advertising
This manual is related to the following products: