Xylem 6-Series Multiparameter User Manual

Page 22

Advertising
background image

Sondes

Section 2

YSI Incorporated

Environmental Monitoring Systems Operations Manual

2-16

INSTALLING THE ISE PROBES

Figure 28

The Ammonium, Nitrate and Chloride ISE probes do not have slip

nuts and should be installed without tools. Use only your fingers

to tighten. Any ISE probe can be installed in any of the three ports

labeled “3”, “4”, and “5” on the sonde bulkhead of the 6820V2-1,

6920V2-1, and 6600V2-2 sondes or the single ISE port on the

6820V2-2 and 6920V2-2 bulkheads. Be sure to remember

which sensor was installed in which port so that you will later be

able to set up the sonde software correctly.

Figure 29

IMPORTANT: Make sure that the probe nut or probe body

of the ISE probes are seated directly on the sonde bulkhead.

This will ensure that connector seals will not allow leakage.

INSTALLING THE PROBE GUARD

Included with each sonde is a probe guard. The probe guard protects the probes during calibration and

measurement procedures. Once the probes are installed, install this guard by aligning it with the threads on

the bulkhead and turn the guard clockwise until secure.


CAUTION:

Be careful not to damage the Rapid Pulse DO membrane during installation of the probe

guard.

Figure 30 shows the YSI 6820V2-1/6820V2-2/6920V2-1/6920V2-2 probe guard; the guard for the

6600V2-2/6600V2-4 is similar. The YSI 600R, 600QS, 600XL and 600XLM probe guards resemble

Figure 31.

Figure 30

Figure 31

PROBE NUT TO SEAT

ON BULKHEAD

PROBE BODY TO SEAT

ON BULKHEAD

DO PROBE

ISE PROBE

BULKHEAD

(PROBES INSTALLED)

PROBE GUARD

TURN CLOCKWISE BY

HAND TO SECURE

PROBE GUARD

ISE PROBE

INSERT ISE PROBE,

SCREW IN AND TIGHTEN WITH FINGERS.

Advertising
This manual is related to the following products: