2. UNPACKING AND INSTALLATION

2.1. Ultra-microbalaces UYA 3Y

Carefully unpack the balance, remove plastic, cardboard and foil packagings together with

protective elements and using gently movements place the balance onto its location.

Assembly the weighing pan and other elements following the diagram.

After ultra-microbalance installing at operating place, following should be set:

1 – pan shield

2 – bottom ring

3 – balance pan

4 – glass cover

After the elements setting, additional devices should be connected and balance should be

plugged to power source. Power socket is located on back side of electronic module.