Report on completed mass control processes – RADWAG BALANCES 3Y SERIES User Manual

Page 165

Advertising
background image

- 165 -

−

Product

−

Start date

−

End date

−

Batch no.

−

Standard quantity

−

Nominal mass

−

Threshold T2-

−

Threshold T1-

−

Threshold T1+

−

Threshold T2+

−

Measurements

−

Quantity of errors T2-

−

Quantity of errors T1-

−

Quantity of errors T1+

−

Quantity of errors T2+

−

Average

−

Average [%]

−

Standard deviation

−

Standard deviation

−

Standard deviation [%]

−

Empty line

−

Dashes

−

Signature

−

Non-standard printout

28.5. Report on completed mass control processes

On completing any type of mass control process a report is generated. The report is saved
in the database <

Mass controls >.

The files are named by their date and time (hour) of

process completion.


Advertising