Balances as 3y series – RADWAG BALANCES 3Y SERIES User Manual

Page 13

Advertising
background image

- 13 -

2.3. Balances AS 3Y series

Carefully remove the balance from its packaging, remove the plastic and foil

transport protective elements. Gently place the balance in its intended place of

use. Install the weighing pan, and other elements according to below scheme.


Analytical balances AS 3Y series

A – balance with reading unit

d=0,01mg
B – balance with reading unit

d=0,1mg

On installing the balance in its

intended place of use, remove transport

lock (1) – press the lock gently and turn it

accordingly to OPEN/CLOSE instruction,

next remove the lock. Please retain the

lock should the device be transported in

the future. Next assembly:

2 – bottom shield of the weighing

chamber

3 – centering ring

4 – weighing pan

5 – pan shield

On assembling all components,

connect peripheral devices to the

balance, and plug the balance to

mains. Power socket is located at the

back of balance’s housing.

Balance with transport lock mounted on

Advertising