Applying Power

Install the drive cover, and apply power to the drive. The embedded EtherNet/IP
adapter receives its power from the drive. When you apply power to the
embedded EtherNet/IP adapter for the first time, its ENET status indicator
should be steady green or flashing green after an initialization. If it is red, there is
a problem. See

Chapter 7

, Troubleshooting.

Start-Up Status Indications

After power has been applied, the drive STS (status) indicator and the embedded
EtherNet/IP adapter ENET and LINK status indicators can be viewed on the front
of the drive (

Figure 3

). Possible start-up status indications are shown in

Table 1

.

Figure 3 - Drive and Adapter Status Indicators

ATTENTION: Risk of equipment damage, injury, or death exists. Unpredictable
operation may occur if you fail to verify that parameter settings are compatible
with your application. Verify that settings are compatible with your application
before applying power to the drive.