Dell PowerVault ML6000 User Manual

Page 258

Advertising
background image

Chapter 12 Installing, Removing, and Replacing

Adding 9U Library Expansion Modules to an Existing Library

Dell PowerVault ML6000 User’s Guide

258

4

If your library contains FC I/O blades, install both the I/O blades

and the accompanying fan blades in the expansion module. For

details, see and

Adding, Removing, and Replacing the FC I/O Fan

Blade

on page 370.

5

Add the power supplies.For details, see

Adding, Removing, and

Replacing Power Supplies

on page 330.

6

Connect all power cords, network data cables, and module-to-

module cables. Make sure the module terminators are installed at the

top and bottom of the stack of modules. For cabling instructions, see

Cabling the Library

on page 212.

7

Power on the library. For libraries larger than a ML6020, boot time

may take 15-20 minutes.

8

Configure the library using the

Setup Wizard

that appears on the

operator panel interface.

9

Add the tape cartridges to the library’s modules using the I/E station

commands from the operator panel or Web client.

10

Open the host application and reinventory in order to synchronize its

logical inventory with the physical inventory of the library.

Adding 9U Library Expansion Modules to an Existing
Library

Adding 9U Library Expansion Modules to the library increases the

number of data cartridges available within the library system. These

instructions explain how to add a 9U Library Expansion Module to an

existing library.

Advertising