Viewing the ivt logs, Saving and e-mailing the ivt logs – Dell PowerVault ML6000 User Manual

Page 407

Advertising
background image

Chapter 13 Troubleshooting

Using the Installation Verification Test

Dell PowerVault ML6000 User’s Guide

407

• Select

Stop

on the

Library Test Progress

screen to cancel the current

IVT run between subtests. The last issued commands will complete

before library control is returned.

• Once the selected tests are complete, select

Next

. You can choose to

view the detailed IVT log or e-mail the detailed IVT log. Make your

choice and select

Next

.

The IVT test cannot be performed from the Web client. The path to open

the appropriate screen is as follows:

• From the operator panel, select

Tools > Library Tests > Installation &

Verification Tests

.

Viewing the IVT Logs

13

A new IVT log is created each time you run IVT. The log reports detailed

information about library readiness and indicates where specific

marginal conditions and failures are located in the library subsystems if

there are any. You can view a summary or detailed version of a log

following an IVT run.
The paths to open the appropriate screens are as follows:

• From the Web client, select

Reports > Log Viewer > Installation

Verification Test Summary Log

.

• From the Web client, select

Reports > Log Viewer > Installation

Verification Test Detailed Log

.

• From the operator panel, select

Tools > Library Tests > View Last

Summary Log

.

• From the operator panel, select

Tools > Library Tests > View Last

Detailed Log

.

Saving and E-mailing the
IVT Logs

13

You can save and e-mail the summary and detailed IVT logs as a text file

using the Web client. From the operator panel, you can e-mail the

detailed IVT log as a text file.
The path to open the appropriate screens are as follows:

• From the Web client, select

Reports > Log Viewer > Installation

Verification Test Summary Log

.

Advertising