Preparing modules for rack installation – Dell PowerVault ML6000 User Manual

Page 342

Advertising
background image

Chapter 12 Installing, Removing, and Replacing

Installing the Library in a Rack

Dell PowerVault ML6000 User’s Guide

342

4

Visually make sure that both shelves are level, and that they are

aligned properly within the rack.

5

Make sure that all thumbnuts are fastened tightly. Some thumbnuts

may have loosened during installation.

Preparing Modules for
Rack Installation

12

1

Power off your library and disconnect all power cords, network data

cables, and module-to-module cables.

2

Remove all tape cartridges, tape drives, power supplies, and all cords

and cables from the library modules. The modules are much easier to

lift into the rack without the additional weight of the tape drives.

3

Park the robot assembly in the 5U Library Control Module.

(Regardless of which module you are installing, the robot must be

parked in the 5U Library Control Module before you begin moving

the modules into the rack.)

a

Open the I/E station and access doors of each module.

b

Using your hands, gently lift the robot assembly into the 5U

Library Control Module. The robot assembly should glide slowly

and with some resistance.

c

After raising the robot assembly to the approximate middle of the

5U Library Control Module, hold it in place with one hand and,

using your other hand, move the parking tab in a counter-

Warning:

Without tape drives, tape cartridges, or power

supplies, a 5U Library Control Module weighs

approximately 60 lbs (27.2 kg). A 9U Library

Expansion Module, without tape drives, tape

cartridges, or power supplies, exceeds 65 lbs (29.5 kg).

To avoid serious injury, at least two people are

required to safely lift the modules.

Caution:

Support the robot assembly by holding onto the broad

metal X-axis plate. Lifting the robot by the thin metal

rod will bend the rod. Lifting the robot by the black

plastic picker body can damage the robot.

Advertising