Read this first: complete installation steps – Dell PowerVault ML6000 User Manual

Page 362

Advertising
background image

Chapter 12 Installing, Removing, and Replacing

Adding, Removing, and Replacing FC I/O Blades

Dell PowerVault ML6000 User’s Guide

362

Read This First:
Complete Installation
Steps

12

When installing an FC I/O blade, you must follow the installation steps

in this order or communication with the FC I/O blade and tape drives in

the library will not work properly.

You may perform the following steps with the library powered on.

1

Ensure you are running 400-level firmware or above.

2

Save the library configuration (see

Saving the Library Configuration

on page 385).

3

Connect the Ethernet cable from the Library Control Blade to the 9U

Library Expansion Module(s). For each FC I/O blade installed in a

9U Library Expansion Module, connect the 9U Library Expansion

Module containing the FC I/O blade(s) to a port in the Ethernet hub

on the LCB (see

Figure 29

on page 231).

• If the FC I/O blade is installed in the bottom bay of the 9U Library

Expansion Module, connect one end of an Ethernet cable to the

Ethernet port labeled

LOWER

in the lower right corner of the 9U

Library Expansion Module. Connect the other end of the cable to a

port in the Ethernet hub on the LCB.

• If the FC I/O blade is installed in the upper bay of the 9U Library

Expansion Module, connect one end of an Ethernet cable to the

Ethernet port labeled

UPPER

in the lower right corner of the 9U

Library Expansion Module. Connect the other end of the cable to a

port in the Ethernet hub on the LCB.

Caution:

If you are adding a new FC I/O blade or completely

removing an FC I/O blade, be sure to read

Working With

Control Paths

on page 86. If you do not configure control

paths correctly, you will experience communication

problems with tape drives and media changer devices

(partitions).

Caution:

If the Ethernet cable between the LCB and the 9U Library

Expansion Module is not connected when power is

applied to the blade, the blade will hang in the “Booting”

state.

Advertising