Beisler 100-68 User Manual
Page 124
Advertising
6.6.2.2 Testing the bobbin thread monitor
This program serves for aligning the reflected light barriers of the
bobbin thread monitors.
full
empty
Test with full bobbin
–
Insert a full bobbin.
–
Cover the bobbin thread monitor against extraneous light.
–
Pull the bobbin thread.
–
A value between “0 – 4” should be indicated in the bar graph.
Test with empty bobbin
–
Insert an empty bobbin.
–
Cover the bobbin thread monitor against extraneous light.
–
Turn the empty bobbin until the surface is in parallel position to the
bobbin thread monitor.
–
A value between 8 – 15” should be indicated in the bar graph.
–
Tap the function key ESC to quit the test program.
40
Advertising