Putting into operation – Beisler 100-68 User Manual

Page 37

Advertising
background image

6.

Putting into operation

After completion of the installation work a sewing test should be made.

Plug in the mains plug.

Caution: Risk of injury!

Switch the main switch off before threading the needle and hook
thread.

Threading the needle thread (see operating instructions).

Threading the hook thread (see operating instructions).

Switch the main switch on.
The main screen is displayed.

By actuating the central foot switch the different steps of the
feeding process are released one after the other and the sewing
process starts.
The individual steps depend on the working method and on the
equipment of the sewing unit.

ATTENTION !

Please take care that material is positioned under the transport clamps
at the sewing start.
Moving the transport carriage without material may damage the coating
of the transport clamps.

For the selection of the sewing program and for further settings of
the control unit see part 4: Programming instructions 100/68

For feeding and operating see part 1: Operating instructions 100/68

7

Advertising