Westermo MRI-128-F4G-PSE24 User Manual

Page 66

Advertising
background image

62

4.4.4 PoE Scheduling

The PoE Scheduling control is a powerful function which helps you to save power
and money. You need to configure PoE Scheduling and select a target port

manually to enable this function.

4.4.5 PoE Status

The PoE Status page shows the operating status of each power and each PoE Port.

The power information includes power input voltage,budget, power aggregation,
redundancy status, Total Power budget, Total Output Power, Warning Water

Level and Utilization. The PoE Port information includes PoE mode, Operation

status, PD class, Power Consumption, Voltage and Current.

Power aggregation: if the powers are in the same priority level (primary,

secondary or tertiary), the powers will be aggregated. Use the same voltage

power will become power aggregation.

Power redundancy: if the powers are in the different priority level, the secondary

power will be backup power for primary. The tertiary power will be backup power

for primary or secondary.

Advertising
This manual is related to the following products: