Connecting the sensors to the monitor – ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 102

Advertising
background image

Sensor Installation and Connection 3-45

Connecting the Sensors to the
Monitor

After installing the ring and sensors and securing the sensor cables

to the pipe and manhole wall, connect the sensor cables to the

appropriate ports on the top of the monitor. The ports are labeled to

identify the appropriate connection for each sensor.
Connect the sensor cables to the monitor ports in the following way:
1. Place the monitor in an upright position to view the monitor

connector ports.

COMM

VELOCITY

ULTRASONIC

ADSENV.COM

PRESSURE

U.S.A.

R

EEx ia IIB T4

Sira 06ATEX2039X

II 1 G

R

0518

MODEL: 5000 - IS1

Use only battery pack 106152

TEST PRESSURE

12 PSI MAX

Cable connector ports

2. Visually inspect each sensor connector and monitor connector

port for damaged or broken pins. Replace a monitor or sensor

with defective ports or connectors.

3. Visually inspect each sensor and monitor connector port for

debris and moisture. Clean off any debris, and dry any surface

moisture. Compressed air is useful for removing moisture from

the inside of the connectors or ports (pin and socket surfaces).

4. Verify that the waterproof seal is present inside each connector

port. The bright orange, rubber seal should sit at the bottom of

the connector port with the pins protruding through the seal.

Advertising