ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 93

Advertising
background image

3-36

ADS FlowShark IS Manual

2. Determine which end of the band will be the long end (end

extending almost completely up one side of the pipe). For cable

routing purposes, ADS recommends reserving the left side of

the pipe (upstream from the manhole) for the long end of the

band.

Note:

Position the edge of the band with the cable tie

holes (edge with small holes) facing downstream.

3. Determine the appropriate location on the band to mount the

Doppler velocity sensor, making sure the sensor will be both
above

the silt level and below the flow surface during minimum

flows.

If silt is not present, locate the sensor on the band so it will

be at the bottom center of the pipe once installed.

If silt is present, locate the sensor slightly up the long end

of the band so it will be above the silt level once installed.

4. Mount the sensor onto the inside of the band with two 4-40 x

5/16-inch

countersink screws, making sure the beveled end of

the sensor faces the upstream edge of the ring (edge opposite

cable tie holes). If holes do not exist on the band at or near the

desired mounting location for the sensor, drill holes in the band

using a 7/32-inch drill bit.

5. When applicable, mount the pressure depth sensor to the band

in the following way:

Mount the pressure depth sensor 2 inches to the left of the

Doppler velocity sensor. Make sure the sensor will be
underneath the flow once installed

.

Secure the pressure depth sensor to the band using two 4-

40 x 5/16-inch

countersink screws. If the sensor does not

have screw inserts, use two medium-sized cable ties to

secure the sensor to the ring. Crisscross the cable ties

across the top of the sensor and underneath the band.

6. Secure the sensor cables along the downstream edge of the long

end of the band according to the instructions in Securing the
Cables to the Band

on page 3-41.

Advertising